Support

Cycle Time Scatter Chart for Jira Dashboard

Contact

Email wangxydlut@gmail.com and include the details below. This is a small app maintained by one person; replies are best-effort and there is no guaranteed response time.

What to include

These four things let most problems be diagnosed from the first message:

Common questions

Why is a percentile line missing?
Percentile lines are only drawn when there are enough samples for the number to mean something. Below that threshold the line is deliberately omitted and the gadget says how many samples are needed. A 95th percentile computed from a handful of issues would just be the maximum, which is worse than showing nothing.

Why does the count not match my filter?
The gadget counts issues that completed inside the time window and that have a recorded transition into the status you chose as "started". Some issues are excluded, and the gadget always shows how many and why — it never silently counts them as zero.

An issue's cycle time looks wrong.
If an issue was reopened, the last completion is used. If an issue re-entered the start status, the last entry is used. If an issue was created already sitting in the start status, there is no "entered the start status" event to find, so its clock starts at creation — those items are counted separately and the count is shown.

Privacy

What the app reads and stores is documented in the privacy policy. In short: it reads Jira issues as you, stores a one-hour cache inside Atlassian's own storage, and sends nothing to any external service.